View a connected assignment in the Shift Planning System
Check the additional shift if the connection to the Shift Planning System is configured.
Prerequisites
Section titled “Prerequisites”Required role: Assigned person with a personal account in the Shift Planning System.
This guide requires the optional Booking and Shift Planning System connection. Without this connection, ask your coordinator how to view assignments.
-
Open My roster (Mein Dienstplan) in the Shift Planning System.
-
Select the assignment’s month. If needed, activate Assigned (Eingeteilte) to hide days without shifts.
-
Find the assignment’s date, offer or work area, and time span.
-
Compare the shift time with the visit time. Scheduled preparation and follow-up may extend the shift time.
-
Check existing notes and clarify discrepancies with the coordinator before confirming the assignment.
Check the result
Section titled “Check the result”The correct assignment is visible and its working time can be verified. A visible guiding assignment does not confirm publication of other departmental rosters.
If the process differs
Section titled “If the process differs”If the assignment is missing, check the month and filters. Then have the assignment in the Booking System and the connection checked.