Shift swap requests
Distinguish a swap request, a proposal, and an approved swap.
A shift swap involves several participants. One person advertises their own shift, others propose suitable shifts of their own, and the responsible planners check the change. Willingness to swap does not yet change the roster.
Use both lists
Section titled “Use both lists”Open Shifts → Swap requests (Dienste → Tauschanfragen). My swap requests (Meine Tauschanfragen) contains your own advertised requests. Other people’s swap requests (Tauschanfragen anderer Personen) is the entry point for requests for which you can make a proposal. Lists may differ by role.
Check the Select period (Zeitraum wählen) filter, search, and status. Requested (Angefragt), Approved (Genehmigt), Refused (Abgelehnt), and Expired (Abgelaufen) describe the request state. The date, time, and work area identify the specific shift.
Assess a proposal
Section titled “Assess a proposal”Compare both shifts. Can the people work in each other’s work areas? Do the times, contracts, and other assignments fit? Only the responsible decision and subsequent comparison of both rosters prove a completed swap.
If no data appears, check the period and status. Do not create a new request merely to find an existing one under the wrong filter.
Request a shift swap
Section titled “Request a shift swap”Prerequisites
Section titled “Prerequisites”Required role: Employees with swap permission.
Your relevant shift exists and is available for swapping. Your organisation has defined the swap route and responsible approval. The swap period configured in the contractual basis may limit selection.
-
Open My roster (Mein Dienstplan) and select Advertise swap request (Tauschanfrage ausschreiben) at your relevant shift.
-
Check the date, time, and work area. In the displayed calendar, specify the days on which you would swap. If necessary, add a factual note and select Request (Anfragen).
-
Check the recorded request under Swap requests (Tauschanfragen). Other authorised employees can offer suitable shifts of their own through Add proposals (Vorschläge hinzufügen). This action belongs to their account, not automatically to your request form.
-
If you need to change your own request, open Change swap request (Tauschanfrage ändern) at the shift, check the possible days, and select Save (Speichern). Then check the saved request.
-
Check the decision in the request area, then the actual shifts. Until the change is confirmed, the locally binding roster applies.
Check the result
Section titled “Check the result”The swap request is recorded traceably. Only the checked decision and actual shifts prove that a swap has taken place.
If the process differs
Section titled “If the process differs”If no request or proposal appears, check the period, status, your own shift, and the configured swap period. Do not agree that a change is complete solely because a request is open.