Shift Planning System: planning areas, rules, and states

Look up staffing displays and approval states.

Term or display Meaning
Location Local planning framework
Department An area with its own monthly roster and release state
Work area A specific assignment area, such as reception
Required staffing Stored staffing need for a shift
0 / 1 people (0 / 1 Personen) In this example, no assigned person where one person is needed
Candidate scoring Selection guidance based on configured rules
Warning A reason to check; specific blocking effects must be checked for each rule
Preview An intermediate version released for viewing
Published (Veröffentlicht) Published state of the relevant departmental month
Shift times confirmed (Dienstzeiten bestätigt) Personal confirmation for the stated period
Assigned staff (Eingeteilte) A filter for days with shifts, not an approval step

The described interface displays Requested (Angefragt), Pre-approved (Vorgenehmigt), Approved (Genehmigt), and Refused (Abgelehnt). Check the state actually reached. Not every intermediate status means the absence is approved.

Rules and scores depend on the configuration. Comparison helps make reasons for a decision visible. It does not prove optimal, fair, or legally complete planning. The responsible planners check shift times, conflicts, and locally applicable requirements.

With a configured connection to the Booking System, guide assignments may be visible in the personal roster while a notice still indicates a missing preview of other rosters. Check each area separately.

The staffing display compares people with daily staffing needs. Planned (Plan) and Actual (Ist) describe planned and actually recorded times respectively. Balance (actual / required) (Saldo (Ist / Soll)) compares working time with the contractual basis in the stated period. These figures answer different questions.

DRZ means working-time averaging period. The contract type defines the framework, while the personal contract limits its validity. Always compare balances for the same person, period, and view.

Work area inactive (Arbeitsbereich inaktiv) can indicate missing valid planning foundations. Not assigned (Nicht eingeteilt) in a personal roster that is still incomplete does not prove a binding day off.

A Change request (Änderungsansuchen) requests a correction to actual time. A Planned / actual discrepancy (Plan / Ist Abweichung) instead shows an existing difference. Monthly confirmation covers all shift times in that month. Subsequent approval of the confirmation is a separate step.