Skip to content

Rosters

Compare staffing needs and coverage and release the checked departmental month.

A roster connects required staffing with specific people and times. Start with the correct month and work from the overview to the department and work area. This shows where a gap exists before you select a person.

Open Shifts → Rosters (Dienste → Dienstpläne). Planners see the overall view. Employees see the departments accessible to them. Select the month first. A department name opens its roster, and a work-area name opens its staffing and people.

View What to use it for
Overall roster Compare staffing across several departments.
Department Check people and work areas together; release the departmental month.
Work area Fill daily staffing needs at a specific assignment location.
Daily view View a day’s existing shifts and people together.

All days (Alle Tage) and Weekends (Wochenenden) change the displayed portion. The totals selector determines the period evaluated. Check these settings before comparison.

A display such as 0 / 1 people (0 / 1 Personen) compares assigned people with stored staffing needs. Shifts (Dienste) is the total in the selected period. Zero staffing need does not prove that nobody is needed. For Work area inactive (Arbeitsbereich inaktiv), check the valid template and work-area settings.

The person’s balance compares working time with contractual hours. It answers a different question from the staffing display. Warnings or unsuitable working times may remain even when daily staffing needs are covered.

Planned (Plan) describes planned entries, and Actual (Ist) describes actually recorded times. Switching is offered according to role and published roster. Today (Heute) leads to the current month and actual view. After clicking, therefore also check the view.

Preview makes the prepared roster visible. Publication fixes the selected departmental month. Personal monthly confirmation is a later separate step. For a guide department connected to the Booking System, release may be controlled in the Booking System.

After publication, planned entries are protected. Handle actual-time changes through the intended actual-time or change route. Do not change the planning foundations to correct an individual actual-time discrepancy.

Check staffing needs and candidate warnings

Section titled “Check staffing needs and candidate warnings”

Required role: Planning with access to the affected department.

The location template is valid for the desired period. The work area has the substantively approved times, staffing needs, and rules.

  1. Open Shifts → Rosters (Dienste → Dienstpläne) and select the month. Open the department and required work area.

  2. On the specific day, compare assigned people with required people. For example, 0 / 1 people (0 / 1 Personen) describes one position that is still open. Check the start and end of the staffing need.

  3. Open the unfilled requirement to call up Assign new shift (Neuen Dienst zuweisen) and candidate selection. Compare people, times, and existing assignments.

  4. For a person, open Show rules and rule violations (Regeln und Regelverletzungen anzeigen). Read the rules actually affected. A colour or Score (Score) alone does not explain selection.

  5. Clarify conflicts and necessary competencies with the responsible team. Only then select a suitable person.

You know the specific unfilled requirement and the reasons for selection. Candidate scoring supports the manual decision and does not replace a complete substantive review.

For Work area inactive (Arbeitsbereich inaktiv), zero staffing need, or No available people (Keine verfügbaren Personen), check Templates, Work areas, and Users. A missing valid contract or an overlap can remove a person from selection. A high-priority rule is not automatically a technical block.

Required role: Planning with assignment permission.

You have checked staffing needs and rule notices. The department, work area, month, and specific day are clear.

  1. Open the unfilled requirement in the work area. In the Assign new shift (Neuen Dienst zuweisen) dialogue, check the date and work area.

  2. Check From (Von) and To (Bis). Shift time affects the available selection of people. After a time change, check the reloaded list again.

  3. Select the suitable person. Open Show rules and rule violations (Regeln und Regelverletzungen anzeigen) and compare the time account, qualification, and conflicts. Allow for a displayed fixed shift length.

  4. If necessary, add Internal comment (Interner Kommentar) or Shift comment (Dienstkommentar). Internal notes and shift comments visible to roster readers have different recipients.

  5. Select Assign (Zuweisen). Then check the person, date, time span, and staffing display on the same day.

The specific shift contains the selected person and checked times. Check the rest of the roster for further unfilled staffing needs. One assignment does not create a complete monthly roster.

If the candidate list or saving does not work, check the roster that actually exists before trying again. With a published roster, the planned view may be locked. Use the intended change route. The local dialogue check could not be completed fully and remains open in the internal review record.

Required role: Planning with release permission.

All shifts, unfilled staffing needs, requests, and rule notices for the departmental month have been checked. The required people and information recipients are known.

  1. Under Rosters (Dienstpläne), open the specific department and correct month. Release applies to this departmental month.

  2. Select Release preview (Vorschau freigeben). Check the month named in the dialogue and select Confirm (Bestätigen) if employees should be able to view the prepared roster.

  3. Check the preview state. A released preview is not yet the published roster.

  4. After the final check, select Publish (Veröffentlichen), check the month in the dialogue again, and select Confirm.

  5. Check Published (Veröffentlicht). Inform affected employees according to your organisation’s procedure and, where applicable, check further departments separately.

The selected departmental month is published. Employees then check their own times. Publication does not yet confirm these times.

For a connected guide department, release may be controlled by the Booking System. A locked planned entry after publication is not corrected by changing a template. Clarify later changes with the responsible planners. Do not repeat publication as an attempt to fix an unclear display.